Picture 1 was a repipe to an existing condensing boiler with 2 heating zones and a third zone on primary for indirect fired hot water heater.

Picture 2 and 3 are the before and after of a new boiler installation with 2 zones and a hydraulic separator we designed to test the theory and system performance.